2006
Last Position : Senior Instrument Engineer
Period :
August 2006 to
June 2020
Job Description :
Im joined with Praxair company US industrial gas from 2006 to 2020 totally 14 years, and now leaved from there after Praxair merged with Linde Firstly, Im started position from filed electrical project engineer 1-2 years ,then changed to instrument project engineer work more than 10 years . Lasted position before leaved was Senior instrument engineer , Im responding support Thailand operation team and global project team China team, US team For Construction experience Im knowledge in Automationhardware and instrument function from concept design project until close the project EPC Term, I able to designed Automationhardware and instrument refer PID or Process Eng. And work at Field for Automationhardware or Instrument when construction phase until commissioning and start-up phase. I have experience from ASU plant Air separation unit plant, SOS Plant Small on-Site plant, CO2 plant Carbon dioxide plant and Operation productivity For Maintenance experience, I have yearly contact with ASU plant at Ayutthaya duration 2009-2020 for Instrument preventive maintenance as his program, Such as Instrument calibrate ,Re-test Instrument loop test to Scada , Control valve and on-off valve Inspection, Re-test Instrument safety functional, Re-test Instrument shutdown, Instrument report after re-test as Praxair format