2017
Last Position : System Engineer & CE Leader (Zone South)
Period :
July 2017 to
February 2022
Job Description :
1. Planned installation, PM, and CM activities to meet SLAs.
2. Designed renewal plans for out-of-warranty R-ATMs.
3. Upgraded hardware/software and resolved technical issues for KBank, BBL, BAY, UOB, TTB, Easy Buy
4. Managed expense reports and cost control for Southern regional engineers.
Key Achievements:
1. Increased hardware availability from 94.79% (2018) to 97.52% (2019).
2. Reduced hardware incidents from 0.81/week/device to 0.45/week/device.
3. Initiated Plan Mileage for proactive spare part replacement.
4. Achieved 0% repeat calls; lowered frequent machine breakdown rate to 0.73%