2567
ตำแหน่งงาน : Internship
ระยะเวลา :
พฤษภาคม 2567 ถึง
มิถุนายน 2567
รายละเอียดงาน :
-Read and interpreted the P&ID (Piping and Instrumentation Diagram) of Khanom Power Plant.
-Acquired knowledge of the operational process of the power plant and various equipment used
within the facility.
-Checked the quality of water in the power plant to ensure that the parameters are within the
standard limits.
-Calibrated various equipment in power plants, such as pressure gauges, pressure switches,
pressure transmitters, RTD, and temperature transmitters.
-Learned about the water treatment system in the power plant.